THE PINES NEIGHBORHOOD
Presentations / Public Meetings
- The Pines Neighborhood Fact Sheet
- Presentation to the Tucson Association of Realtors (1/13/16)
- Palisades at the Pines Neighborhood Update for March 2 flyer (2/24/16)
correspondence
- Email to affected residents regarding grout injection (10/5/2015)
- Letter to the Pines residents (12/21/2015)
- Letter to the Pines residents (1/22/2016)
- Letter to The Pines II residents (1/26/2016)
- After project summary letter to Pines residents (5/31/2016)
MAPS
- Boring Contour Map in Pines Phase 1
- Original Boring Maps in Pines Phase 1
- 1978 aerial
- 1983 aerial
- 1998 aerial
- 2002 aerial
PROCUREMENT OF SERVICES FOR STABILIZATION REPAIr
- Reliable Structures Inc. proposal for repair (6/20/2015)
- Purchase Order #21600018-00 (6/29/2015)
- Purchase Order #21600018-01 (6/29/2015)
- Purchase Order #21600018-02 (6/29/2015)
- Purchase Order #21600018-00 (6/29/2015)
- Terracon Road Stabilization Task Order
- Terracon Scope of Work and Cost Proposal (9/30/2015)
- Purchase order #21600192-00 (10/2/2015)
- Purchase Order #21600192-00 (10/2/2015)
- Terracon Borings (10/7/2015)
- Reliable Structures Inc. agreement (11/17/2015)
- Reliable Structures Inc. agreement rev-1 (11/20/2015)
- Purchase Order #21600287-00 (12/11/2015)
- Purchase Order #21600288-00 (12/11/2015)
- Purchase Order #21600298-00 (12/29/2015)
Engineering studies
- Geotechnical Engineering Report - Phase 1 (12/8/2004)
- Traffic Impact Analysis - prepared for Standard Pacific Homes by Kimley-Horn and Associates, Inc. (May 2005)
- Geotechnical Engineering Report - Phase 1 - Addendum 1- 5 (6/1/2005)
- Geotechnical Engineering Report - Phase 1 - Addendum 6 (2/21/2006)
- Geotechnical Engineering Report - Phase 1 - Addendum 7 (8/29/2006)
- Geotechnical Engineering Report - Phase 1 - Addendum 8 (1/15/2007)
- Geotechnical Engineering Report - Phase 1 - Addendum 9 (7/29/2008)
- Geotechnical Engineering Report - Phase 1 - Addendum 10 (10/15/2008)
- Geotechnical Engineering Report - Phase 1 - Addendum 10 revision (10/15/2008)
- Drainage Report for The Pines Phase 1 (6/6/2005, revised 8/18/2005)
- The Pines Phase 1 Hydraulic Analysis for Storm Drain Design Revisions (11/4/2005)
- Pines Phase 1 Soils Report (8/29/2006)
- Earthwork Testing and Construction Monitoring - Terracon letter (8/28/2007)
- Mitigation of Uncontrolled Fills - Terracon letter (6/3/2010)
- Geotechnical Engineering Evaluation - Pattison Engineering (3/30/2015)
- Geotechnical Engineering Evaluation review - ProTex (7/29/2015)
- Pines Phase 1 Characterization of Existing Fill Profile - Terracon (10/8/2015)
plans
town Council actions
- Approving and authorizing a preliminary plat for The Pines Phase 1 (1/3/2006)
- Final resolution approving and authorizing a preliminary plat for The Pines Phase 1 (1/3/2006)
- Approving and authorizing a final plat for The Pines Phase 1 (7/5/2006)
- Final resolution approving and authorizing a final plat for The Pines Phase 1 (7/5/2006)
- Report to Council for the emergency procurement of soil stabilization and repair (6/25/2015)
- Final resolution approving the transfer of funds for the stabilization project (12/1/2015)